Building health · MANHATTAN, NY
built 1900 · 5 stories · 9 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Oct
Latest accepted inspection Oct 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Jan
Heat or hot water
Housing Maintenance Code Complaints and Problems
2023 Oct
MoldApt 5A class C
Housing Maintenance Code Violations
2023 Feb
Alteration permit
DOB NOW: Build – Approved Permits
2022 Nov
General construction permit
2022 Nov
Mechanical systems permit
2012 Mar
Plumbing permit, General construction permit
2011 Aug
Plumbing permit, General construction permit
2010 Apr
Fire protection permit
2010 Mar
Plumbing permit, General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2001 Apr
Latest boiler work permit 2001 (2 on record)
DOB Permit Issuance (BIS)
2001 Feb
Other conditionsApt 2FL class B · never closed
Housing Maintenance Code Violations
2001 Feb
Walls, floors and stairsApt 2 class A · never closed
1993 Jun
Boiler burning No. 2 oil (Peerless Jot10Fda-Su PEERLESS JOT10FDA-SU), registration expired since Jun 1993
Clean Air Tracking System (boiler registrations)
1900
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.