Building health · MANHATTAN, NY
built 1922 · 6 stories · 71 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Oct
No active shed permit; permits since Jul 2026, last expired Oct 2026
DOB NOW: Build – Approved Permits
2026 Oct
2 active elevators; latest periodic inspection Oct 2026
DOB NOW Elevator Safety Compliance
2026 Aug
Paint or plasterApt 56
Housing Maintenance Code Complaints and Problems
2026 Jul
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2026 Apr
Latest accepted inspection Apr 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Mar
Boiler burning natural gas (Federal FST-150), registration current since Mar 2026
Clean Air Tracking System (boiler registrations)
2026 Feb
General construction permit
DOB NOW: Build – Approved Permits
2025 Nov
General construction permit
2025 Oct
Latest boiler work permit 2025
DOB Permit Issuance (BIS)
2025 Oct
Boiler equipment permit
DOB NOW: Build – Approved Permits
2025 Sep
Smoke or CO detectorsApt 58 class B · closed
Housing Maintenance Code Violations
2025 Sep
Smoke or CO detectorsApt 58 class B · closed
2025 Sep
Doors and windows class B · closed
2025 Sep
Doors and windows class C · closed
2025 Sep
Doors or windowsApt 48
Housing Maintenance Code Complaints and Problems
2025 Aug
Doors or windowsApt 49
2025 Aug
Doors or windowsApt BASEME
2025 Aug
Other conditionsApt 58 class B
Housing Maintenance Code Violations
2025 Aug
Walls, floors and stairsApt 58 class B
2025 Aug
Walls, floors and stairsApt 58 class B
2025 Aug
Walls, floors and stairsApt 58 class B
2025 Aug
Fire safetyApt 58 class C · closed
2025 Aug
Fire safetyApt 58 class C · closed
2025 Aug
PestsApt 58 class C · closed
2025 Aug
Doors or windowsApt 48
Housing Maintenance Code Complaints and Problems
2025 Jul
Doors or windows, electrical, paint or plaster, pestsApt 58
2025 Jul
Doors or windows, electrical, general repairs, plumbing, pestsApt 56
2025 Mar
AppliancesApt 52
2025 Mar
Mold, pestsApt 1A
2025 Mar
Unsanitary conditions
2025 Mar
MoldApt 1A
2025 Mar
Doors or windows, mold, pestsApt 1A
2025 Jan
Heat or hot waterApt 6A
2024 Nov
PlumbingApt 24
2024 Nov
Heat or hot waterApt 24
2024 Oct
Heat or hot water, leaksApt 24
2024 Oct
Doors or windowsApt 3A
2024 Aug
Doors or windows, electricalApt 46
2024 Mar
Sprinklers permit, Plumbing permit
DOB NOW: Build – Approved Permits
2024 Feb
Heat or hot waterApt 36
Housing Maintenance Code Complaints and Problems
2024 Jan
Heat or hot water
2023 Oct
Heat or hot water
2023 Oct
Heat or hot water
2023 Oct
Heat or hot water
2023 Oct
Heat or hot water
2023 Jun
Antenna permit
DOB NOW: Build – Approved Permits
2021 May
Safe with a repair and maintenance program (cycle 9, filed May 2021)
DOB NOW: Safety – Facades Compliance Filings
2020 Jul
General construction permit
DOB NOW: Build – Approved Permits
2019 Dec
PestsApt 1A class C
Housing Maintenance Code Violations
2019 Dec
Walls, floors and stairsApt 56 class B
2019 Dec
Walls, floors and stairsApt 56 class B
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2016 Jun
General construction permit, Plumbing permit
DOB NOW: Build – Approved Permits
1922
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.