Building health · MANHATTAN, NY
built 1915 · 5 stories · 8 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jun
Latest accepted inspection Jun 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Jan
PestsApt 2B
Housing Maintenance Code Complaints and Problems
2025 Nov
Heat or hot waterApt 2B
2025 Nov
Heat or hot waterApt 2B
2025 Nov
Heat or hot waterApt 2B
2025 Nov
Heat or hot waterApt 2B
2025 Nov
Heat or hot waterApt 2B
2025 Jul
Sign permit
DOB NOW: Build – Approved Permits
2025 Jan
Boiler burning natural gas (Rheem G100-400), registration current since Jan 2025
Clean Air Tracking System (boiler registrations)
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2018 Oct
General construction permit
DOB NOW: Build – Approved Permits
2017 May
Sign permit
2016 Nov
Fire protection permit
2016 Sep
Plumbing permit, General construction permit, Heating/ventilation permit
2016 Jul
Plumbing permit
2015 Oct
Sign permit
2015 May
No active shed permit
2015 Jan
Fire protection permit
2010 Feb
Latest boiler work permit 2010 (2 on record)
DOB Permit Issuance (BIS)
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1915
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.