Building health · MANHATTAN, NY
built 2012 · 13 stories · 33 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Oct
Latest accepted inspection Oct 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Mar
3 active elevators; latest periodic inspection Mar 2026
DOB NOW Elevator Safety Compliance
2024 May
Boiler burning natural gas (Laars PNCH-0500NACK2CJN), registration current since May 2024
Clean Air Tracking System (boiler registrations)
2022 Feb
Safe with a repair and maintenance program (cycle 9, filed Feb 2022)
DOB NOW: Safety – Facades Compliance Filings
2017 Dec
0 open. 1 violations on record in all, 2017 — the 0 most recent are listed here
Housing Maintenance Code Violations
2017 Feb
Standpipe permit
DOB NOW: Build – Approved Permits
2017 Feb
Standpipe permit, Sprinklers permit
2014 Jun
No active shed permit
2014 Jun
New building permit
2014 May
Heating/ventilation permit
2014 Apr
General construction permit
2014 Feb
General construction permit
2013 Oct
Latest boiler work permit 2013
DOB Permit Issuance (BIS)
2013 Oct
Boiler permit
DOB NOW: Build – Approved Permits
2013 Jul
General construction permit
2013 Jul
Scaffold permit
2012
Built
PLUTO (tax lot data)
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.