Building health · MANHATTAN, NY
built 1950 · 5 stories · 42 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jun
1 active elevator; latest periodic inspection Jun 2026
DOB NOW Elevator Safety Compliance
2026 Apr
Pests class A · paperwork
Housing Maintenance Code Violations
2026 Mar
Latest accepted inspection Mar 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Aug
General construction permit
DOB NOW: Build – Approved Permits
2025 May
Latest boiler work permit 2025 (2 on record)
DOB Permit Issuance (BIS)
2025 May
Boiler equipment permit
DOB NOW: Build – Approved Permits
2025 May
Plumbing permit
2025 May
Boiler equipment permit
2025 May
Boiler burning natural gas (H.B. Smith 28HE-S/W-5), registration current since May 2025
Clean Air Tracking System (boiler registrations)
2025 May
General construction permit
DOB NOW: Build – Approved Permits
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2023 Oct
VT-CAT1-CO Elevators
DOB Violations
2023 Jan
General construction permit
DOB NOW: Build – Approved Permits
2022 Oct
No active shed permit; permits since Oct 2021, last expired Oct 2022
2022 Apr
Plumbing permit
2022 Apr
General construction permit
2022 Feb
Plumbing permit
2022 Jan
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1950
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.