Building health · MANHATTAN, NY
built 1949 · 5 stories · 34 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Aug
Boiler burning natural gas (H.B. Smith 28A - S/W - 07), registration current since Aug 2026
Clean Air Tracking System (boiler registrations)
2026 Apr
Latest accepted inspection Apr 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Mar
1 active elevator; latest periodic inspection Mar 2026
DOB NOW Elevator Safety Compliance
2021 Aug
Plumbing permit
DOB NOW: Build – Approved Permits
2021 Jul
Plumbing permit
2021 Jun
General construction permit
2021 May
General construction permit
2020 Oct
Plumbing permit
2020 Jan
General construction permit
2018 Nov
General construction permit
2018 Oct
Plumbing permit, General construction permit
2018 Sep
General construction permit
2014 Mar
No active shed permit
2010 Dec
Latest boiler work permit 2010
DOB Permit Issuance (BIS)
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1949
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.