Building health · MANHATTAN, NY
built 1924 · 6 stories · 31 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jun
Boiler burning natural gas (H.B. Smith 28HE-S/W-08), registration current since Jun 2026
Clean Air Tracking System (boiler registrations)
2026 May
Plumbing permit
DOB NOW: Build – Approved Permits
2026 May
General construction permit
2026 Apr
PestsApt 5B
Housing Maintenance Code Complaints and Problems
2026 Jan
Latest accepted inspection Jan 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Dec
Heat or hot water
Housing Maintenance Code Complaints and Problems
2025 Dec
Heat or hot waterApt 5B
2024 Sep
Heat or hot water
2024 Aug
Leaks class C · closed
Housing Maintenance Code Violations
2024 Aug
Fire safety class B · closed
2024 Aug
Walls, floors and stairs class A · closed
2024 Aug
Heat or hot water
Housing Maintenance Code Complaints and Problems
2022 Jul
Plumbing permit
DOB NOW: Build – Approved Permits
2022 Jul
General construction permit
2022 Jan
Plumbing permit
2020 Dec
General construction permit
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2017 Oct
Plumbing permit
DOB NOW: Build – Approved Permits
2017 Sep
Plumbing permit, General construction permit
2017 Aug
Plumbing permit
2017 Aug
Latest boiler work permit 2017
DOB Permit Issuance (BIS)
1924
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.