Building health · MANHATTAN, NY
built 1899 · 8 stories · 5 apartments
Also known as 66 Wooster St — one building, several doors.
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
3 active elevators; latest periodic inspection Sep 2026
DOB NOW Elevator Safety Compliance
2026 Jun
Alteration permit, Plumbing permit
DOB NOW: Build – Approved Permits
2026 Jan
Plumbing permit
2025 Oct
Safe (cycle 10, filed Oct 2025)
DOB NOW: Safety – Facades Compliance Filings
2025 Aug
Latest accepted inspection Aug 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Jun
Sprinklers permit, Plumbing permit
DOB NOW: Build – Approved Permits
2025 May
Mechanical systems permit
2025 Apr
General construction permit
2025 Apr
No active shed permit; permits since Mar 2018, last expired Apr 2025
2024 Nov
Mechanical systems permit, General construction permit
2024 Nov
Latest boiler work permit 2024
DOB Permit Issuance (BIS)
2024 Nov
Boiler equipment permit
DOB NOW: Build – Approved Permits
2024 Nov
Boiler burning natural gas (Weil-Mclain 988), registration current since Nov 2024
Clean Air Tracking System (boiler registrations)
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1899
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.