Building health · MANHATTAN, NY

61 1 Ave

built 1900 · 5 stories · 15 apartments
Also known as 130 E 4 St — one building, several doors.

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Safety
Housing Maintenance Code Complaints and Problems
2026 Feb
Heat or hot waterApt 7
2025 May
Plumbing permit
DOB NOW: Build – Approved Permits
2025 Apr
Mechanical systems permit, General construction permit
2017 Oct
General construction permit, Heating/ventilation permit, Plumbing permit
2017 Aug
Latest accepted inspection Aug 2017, defects reported: no
DOB NOW: Safety Boiler
2016 Apr
0 open. 10 violations on record in all, 1998–2016 — the 0 most recent are listed here
Housing Maintenance Code Violations
2015 Dec
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
2015 Oct
Heating/ventilation permit
2015 Sep
Plumbing permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1996 Jan
Construction never closed
DOB Violations
1992 Aug
Latest boiler work permit 1992
DOB Permit Issuance (BIS)
1900 Jan
Boiler burning No. 4 oil (Crotty Csm-50 CROTTY CSM-50), registration cancelled since Jan 1900
Clean Air Tracking System (boiler registrations)
1900
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.