Building health · MANHATTAN, NY
built 2015 · 10 stories · 62 apartments
Registered with the city: SUTTON MANAGEMENT CORP · 5 other buildings here list it; WEST 161ST ST. ASSOCIATES LLC; WEST 161 ST. ASSOCIATES LLC
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Feb
Latest accepted inspection Feb 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Sep
2 active elevators; latest periodic inspection Sep 2025
DOB NOW Elevator Safety Compliance
2025 Jul
Doors or windowsApt 2D
Housing Maintenance Code Complaints and Problems
2025 Jan
Heat or hot waterApt 65
2024 Jan
Walls, floors and stairsApt 3D class B
Housing Maintenance Code Violations
2023 Nov
Appliances, heat or hot waterApt 8E
Housing Maintenance Code Complaints and Problems
2023 Nov
Floors or stairsApt 3D
2023 Oct
VT-CAT1-CO Elevators
DOB Violations
2023 Oct
VT-CAT1-CO Elevators
2023 Oct
VT-CAT1-CO Elevators
2023 Oct
VT-CAT1-CO Elevators
2023 Feb
Safe with a repair and maintenance program (cycle 9, filed Feb 2023)
DOB NOW: Safety – Facades Compliance Filings
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2018 Mar
Heat or hot water class C · paperwork
Housing Maintenance Code Violations
2017 Sep
Walls, floors and stairs class A
2017 Sep
Walls, floors and stairs class A
2017 Sep
Other conditions class B
2017 Sep
Leaks class A
2017 Sep
Smoke or CO detectors class A
2017 Sep
Smoke or CO detectors class A
2017 Sep
Walls, floors and stairs class A
2017 Aug
Walls, floors and stairs class A
2017 Aug
Leaks class A
2017 Aug
Walls, floors and stairs class A
2017 Aug
Smoke or CO detectors class A
2017 Aug
Smoke or CO detectors class A
2017 Aug
Heat or hot waterApt 4E class C
2017 Feb
No active shed permit
DOB NOW: Build – Approved Permits
2016 Mar
New building permit
2016 Feb
Scaffold permit
2015 Sep
Construction fence permit
2015 Jun
Standpipe permit
2015 Jun
Standpipe permit, Sprinklers permit
2015 Jun
General construction permit
2015 May
General construction permit
2015 Apr
General construction permit
2015
Built
PLUTO (tax lot data)
2014 Nov
General construction permit
DOB NOW: Build – Approved Permits
2012 Nov
Boiler burning No. 2 oil (H.B. Smith, 28-S-7 H.B. SMITH, 28-S-7), registration expired since Nov 2012
Clean Air Tracking System (boiler registrations)
1998 Nov
Latest boiler work permit 1998
DOB Permit Issuance (BIS)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.