Building health · MANHATTAN, NY
built 1904 · 6 stories · 32 apartments
Also known as 644 W 138 St — one building, several doors.
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Apr
1 active elevator; latest periodic inspection Apr 2026
DOB NOW Elevator Safety Compliance
2026 Mar
Boiler burning natural gas (Laars MT2V-750), registration current since Mar 2026
Clean Air Tracking System (boiler registrations)
2026 Mar
Latest accepted inspection Mar 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Aug
Plumbing permit
DOB NOW: Build – Approved Permits
2024 Jul
General construction permit
2023 Jun
Antenna permit
2021 Jul
Safe (cycle 9, filed Jul 2021)
DOB NOW: Safety – Facades Compliance Filings
2020 Oct
No active shed permit; permits since Apr 2019, last expired Oct 2020
DOB NOW: Build – Approved Permits
2020 Jul
General construction permit
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2018 Nov
0 open. 2 violations on record in all, 1987–2018 — the 0 most recent are listed here
Housing Maintenance Code Violations
2015 Mar
General construction permit
DOB NOW: Build – Approved Permits
2014 Jul
General construction permit
2011 Nov
Plumbing permit, General construction permit
2009 Dec
General construction permit
2006 Oct
General construction permit
1904
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.