Building health · MANHATTAN, NY
built 1925 · 6 stories · 60 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 May
1 active elevator; latest periodic inspection May 2026
DOB NOW Elevator Safety Compliance
2025 Jul
Boiler burning natural gas (Ruud W-724), registration current since Jul 2025
Clean Air Tracking System (boiler registrations)
2025 Mar
Latest accepted inspection Mar 2025, defects reported: no
DOB NOW: Safety Boiler
2024 Jan
No active shed permit; permits since Jan 2023, last expired Jan 2024
DOB NOW: Build – Approved Permits
2023 Jan
General construction permit
2022 Jul
Plumbing permit, Heating/ventilation permit, General construction permit
2022 Jul
Safe with a repair and maintenance program (cycle 9, filed Jul 2022)
DOB NOW: Safety – Facades Compliance Filings
2022 Feb
0 open. 21 violations on record in all, 1994–2022 — the 0 most recent are listed here
Housing Maintenance Code Violations
2021 Dec
Supported scaffold permit
DOB NOW: Build – Approved Permits
2021 Dec
Failure To Post Energy Grade/Score
DOB Violations
2018 Apr
General construction permit
DOB NOW: Build – Approved Permits
2017 Jul
Plumbing permit, General construction permit
2017 Jan
General construction permit
2016 Oct
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1925
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.