Building health · MANHATTAN, NY
built 1872 · 5 stories · 24 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 May
Latest accepted inspection May 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Jun
General construction permit
DOB NOW: Build – Approved Permits
2025 Feb
General construction permit
2025 Jan
Boiler burning natural gas (H.B. Smith 19A-S-7), registration current since Jan 2025
Clean Air Tracking System (boiler registrations)
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2004 Dec
No active shed permit
DOB NOW: Build – Approved Permits
2004 Jul
General construction permit
2003 Oct
Construction non-hazardous · never closed
DOB Violations
2001 Mar
Latest boiler work permit 2001
DOB Permit Issuance (BIS)
2001 Mar
Plumbing permit, Boiler permit, Fuel burning permit
DOB NOW: Build – Approved Permits
1997 Nov
Heat or hot water class B · never closed
Housing Maintenance Code Violations
1997 Nov
Fire safety class A · never closed
1997 Nov
Lead-based paintApt 1B class C · never closed
1997 Nov
Lead-based paintApt 1B class C · never closed
1872
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.