Building health · BROOKLYN, NY

58 Linden Blvd

built 1926 · 6 stories · 47 apartments
Registered with the city: AKELIUS REAL ESTATE MANAGEMENT LLC · 30 other buildings here list it; 5507 - 58 LINDEN BLVD BROOKLYN LLC; 5507-58 LINDEN BLVD BROOKLYN LLC

Apartments named in these records

12 of this building’s 47 apartments are named in a city record. The rest have no record naming them, which is the usual case.

These are city records about an apartment, not about anyone who lives or lived there. They may not be used to screen a tenant.

Fire and safety

Issues on record

Heat and hot water

1 complaint, 2025
Heat source

Boiler burning natural gas (Supreme D3-80-5), registration current since Sep 2025

Clean Air Tracking System (boiler registrations), as of 2026-10-21 · See this building's boiler registrations on NYC Open Data →
Boiler inspection filings

Latest accepted inspection Apr 2026, defects reported: no

DOB NOW: Safety Boiler, as of 2026-10-20 · See the boiler filings at DOB →
What this counts

Accepted annual boiler inspection filings, any date

Boiler work permits

Latest boiler work permit 2015

DOB Permit Issuance (BIS), as of 2026-10-20
What this counts

DOB boiler permits (BIS and DOB NOW); a permit dates work, not the boiler's age

  • Heat and hot water complaintsfound0 heat or hot water complaints

Water and pipes

Issues on record · 1 complaint, 2025

Pests and cleanliness

3 complaints, 2025

Structure and facade

Issues on record, most recently 2025
  • Facade ratingnot requiredNot required: facade inspections apply only to buildings taller than 6 stories
  • Sidewalk shed and scaffoldingno recordNo sidewalk shed permits on record
  • Landmark statusno recordNot in a historic district on record

Flooding

No issues on record
FEMA flood zone

Outside FEMA's 1% annual-chance flood zone: X

FEMA National Flood Hazard Layer, as of 2026-10-21
What this counts

Effective FIRM zones touching the building footprint

Stormwater flooding

Extreme storm, 2080 sea levels: Not in mapped flooding; Moderate storm, 2050 sea levels: Not in mapped flooding; Moderate storm, today's sea levels: Not in mapped flooding; Limited storm, today's sea levels: Not loaded (file format unreadable)

NYC Stormwater Flood Maps, as of 2024-07-03
What this counts

Mapped ponding touching the building footprint

BasementWhole tax lot

Below grade

PLUTO (tax lot data), as of 2026-08-24

Elevators

No issues on record
Elevators

1 active elevator; latest periodic inspection Apr 2026

DOB NOW Elevator Safety Compliance, as of 2026-10-20 · See this building's elevators on NYC Open Data →
What this counts

Active elevator devices registered to this building ID

Rent and tenancy

On the state list
Rent stabilization

On the state's list of buildings with at least one rent-stabilized apartment (2024 registrations)

Rent Stabilized Building Lists (2024 HCR registrations), as of 2025-11-30
What this counts

The list doesn't say which apartments are stabilized, and being listed isn't proof of current status. For a specific apartment, request its rent history from HCR

Energy

Energy

ENERGY STAR score 91 (2024 report)

Energy and Water Data Disclosure (Local Law 84), as of 2025-11-25
What this counts

Letter grades are issued by the city under Local Law 33 and posted near the building entrance; Blueflo shows the reported score only

General condition and all records

HPD violations

17 open: 16 about building conditions — doors and windows (3), lead-based paint (3), walls, floors and stairs (3), fire safety (2); 3 immediately hazardous (class C), 1 about paperwork or notices. Also 1 older record from 2013 never closed. 25 further violations from 2025–2026 were closed. 353 violations on record in all, 2001–2026 — the 93 most recent are listed here

2026 Apr
Doors and windowsApt 3C class C · closed
2026 Apr
PestsApt 5B class C · closed
2026 Apr
PestsApt 5B class C · closed
2025 Oct
Lead-based paintApt 3B class C
2025 Oct
Lead-based paintApt 3B class C
2025 Oct
Lead-based paintApt 3B class C · closed
2025 Oct
Lead-based paintApt 3B class C · closed
2025 Oct
Lead-based paintApt 3B class C · closed
Show 35 more
2025 Oct
Lead-based paintApt 3B class C · closed
2025 Oct
Smoke or CO detectorsApt 3B class B · closed
2025 Oct
Smoke or CO detectorsApt 3B class B · closed
2025 Oct
Doors and windowsApt 3B class A · closed
2025 Oct
Walls, floors and stairsApt 3B class B · closed
2025 Oct
LeaksApt 3B class B · closed
2025 Oct
Doors and windowsApt 3B class A · closed
2025 Oct
Doors and windowsApt 3B class A · closed
2025 Oct
Walls, floors and stairsApt 3B class B · closed
2025 Oct
Doors and windowsApt 3B class A · closed
2025 Oct
Walls, floors and stairsApt 3B class B · closed
2025 Oct
Doors and windowsApt 3B class A · closed
2025 Oct
Doors and windowsApt 6B class B
2025 Oct
Fire safetyApt 6B class B · closed
2025 Oct
Smoke or CO detectorsApt 6B class B · closed
2025 Oct
Smoke or CO detectorsApt 6B class B · closed
2025 Sep
Walls, floors and stairsApt 5B class B · closed
2025 Sep
Walls, floors and stairsApt 5B class B · closed
2025 Sep
Walls, floors and stairsApt 5B class B · closed
2025 Sep
LeaksApt 5B class B · closed
2025 Jun
Lead-based paintApt 3C class C · paperwork
2025 Jun
Lead-based paintApt 3C class C
2023 Jul
Fire safetyApt 5F class B
2018 Oct
Fire safetyApt 6B class B
2018 Oct
Smoke or CO detectorsApt 6B class B
2018 Oct
Smoke or CO detectorsApt 6B class B
2018 Oct
Doors and windowsApt 6B class A
2018 Feb
Walls, floors and stairsApt 5F class A
2018 Feb
Walls, floors and stairsApt 5F class B
2018 Feb
Doors and windowsApt 5F class A
2018 Feb
Walls, floors and stairsApt 5F class A
2018 Feb
PlumbingApt 5F class A
2018 Feb
PestsApt 5F class B
2017 Oct
PestsApt 1A class B
2013 Mar
Walls, floors and stairsApt 6A class B · never closed
Housing Maintenance Code Violations, as of 2026-10-20 · Read these violations in full at HPD Online →
What this counts

Open HPD violations inspected in the last 10 years; class C = immediately hazardous. Paperwork = failure to file, notify or certify

DOB violations

1 open: 1 about filings or paperwork

DOB Violations, as of 2026-10-20 · Read these violations in full at DOB →
What this counts

Open DOB, ECB and DOB NOW Safety violations, any date, one per violation. ECB class 1 = hazardous, class 2 = major

Permit history

22 permits since 1990

DOB NOW: Build – Approved Permits, as of 2026-10-20 · See every permit at DOB →
What this counts

DOB permits issued (DOB NOW and legacy BIS), one per job and work type; excludes sheds

Nothing on record

Gasno record
  • Gas pipingno recordNo open gas piping filing violations. Inspection results themselves are not published

Sources

23 datasets

Each date is when we last checked that dataset, not when the record itself was created.

Every row shows the record it came from and the date it was last checked.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.
For AI and developers: llms.txt · API · MCP server · this card as markdown