Building health · MANHATTAN, NY

54 W 82 St

built 1887 · 4 stories · 6 apartments
Registered with the city: Bridge Property Management · 1 other building here list it; 54 WEST 82ND STREET REALTY CORP

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2024 Dec
Latest accepted inspection Dec 2024, defects reported: no
DOB NOW: Safety Boiler
2024 Sep
Fire safety class C
Housing Maintenance Code Violations
2024 Sep
Leaks class A
2024 Sep
Walls, floors and stairs class A
2024 Sep
Walls, floors and stairs class A
2024 Sep
Smoke or CO detectors class A
2024 Sep
Heat or hot water class C · paperwork
2024 Sep
Walls, floors and stairs class A · paperwork
2024 Sep
Walls, floors and stairs class A
2024 Sep
Smoke or CO detectors class A
2024 Sep
Fire safety class C · closed
2024 Sep
Low Pressure Boiler
DOB Violations
2024 Sep
Low Pressure Boiler
2024 Sep
Low Pressure Boiler
2024 Sep
Low Pressure Boiler
2024 Sep
Low Pressure Boiler
2024 Sep
Plumbing
Housing Maintenance Code Complaints and Problems
2024 Jan
Boiler burning natural gas (Peerless G-560), registration current since Jan 2024
Clean Air Tracking System (boiler registrations)
2023 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2023 Jun
Low Pressure Boiler
DOB Violations
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Apr
Low Pressure Boiler
2023 Apr
Low Pressure Boiler
2023 Apr
Low Pressure Boiler
2023 Apr
Low Pressure Boiler
2023 Apr
Low Pressure Boiler
2020 Aug
Structural permit
DOB NOW: Build – Approved Permits
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2018 Jul
Plumbing permit, Heating/ventilation permit, General construction permit
DOB NOW: Build – Approved Permits
2014 Apr
Heating/ventilation permit, General construction permit
2014 Apr
Plumbing permit, General construction permit
2013 Aug
Plumbing permit, Heating/ventilation permit
2013 Mar
Low Pressure Boiler never closed
DOB Violations
2013 Mar
Low Pressure Boiler never closed
2013 Mar
Low Pressure Boiler never closed
2013 Mar
Low Pressure Boiler never closed
2013 Mar
Low Pressure Boiler never closed
2011 Oct
No active shed permit
DOB NOW: Build – Approved Permits
1887
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.
For AI and developers: llms.txt · API · MCP server · this card as markdown