Building health · MANHATTAN, NY

525 9 Ave

built 1920 · 5 stories · 4 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jun
Latest accepted inspection Jun 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Nov
Fire safetyApt 5A class C · closed
Housing Maintenance Code Violations
2025 Nov
Other conditions class I · paperwork · closed
2025 Nov
MoldApt 5A
Housing Maintenance Code Complaints and Problems
2025 Jun
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2024 Nov
Other conditions class I · paperwork · closed
2024 Apr
Pests class A · paperwork · closed
2023 Jul
ElectricalApt 3B class C
2023 Jul
Fire safetyApt 3B class C
2020 Jul
Walls, floors and stairsApt 3B class B
2020 Jul
Fire safetyApt 3B class C
2020 Jul
Doors and windows class B
2019 Sep
Fire safety class C
2019 Sep
Fire safety class C
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2000 Mar
Plumbing permit, Heating/ventilation permit, General construction permit
DOB NOW: Build – Approved Permits
1999 Jan
Plumbing permit, General construction permit, Heating/ventilation permit
1996 Mar
Construction fence permit, General construction permit
1991 Jan
Electric Signs never closed
DOB Violations
1920
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.