Building health · MANHATTAN, NY
built 1930 · 16 stories · 95 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Aug
General construction permit
DOB NOW: Build – Approved Permits
2026 Jun
Plumbing permit
2026 Jun
General construction permit
2026 Apr
Latest accepted inspection Apr 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Mar
Boiler burning natural gas (Best 5B-100), registration current since Mar 2026
Clean Air Tracking System (boiler registrations)
2026 Mar
4 active elevators; latest periodic inspection Mar 2026
DOB NOW Elevator Safety Compliance
2026 Feb
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2025 Dec
General construction permit
2025 Sep
Plumbing permit
2025 May
Mechanical systems permit
2025 Apr
Safe (cycle 10, filed Apr 2025)
DOB NOW: Safety – Facades Compliance Filings
2025 Jan
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2024 Jul
General construction permit
2024 Feb
No active shed permit; permits since Dec 2019, last expired Feb 2024
2023 Oct
General construction permit
2021 Nov
Failure To Correct Swarmp Conditions (Facade)
DOB Violations
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2016 Jan
Latest boiler work permit 2016
DOB Permit Issuance (BIS)
1930
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.