Building health · MANHATTAN, NY

48 E Broadway

built 1900 · 6 stories · 3 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jul
1 active elevator; latest periodic inspection Jul 2026
DOB NOW Elevator Safety Compliance
2026 Mar
Latest accepted inspection Mar 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Oct
VT-CAT1-CO Elevators
DOB Violations
2024 Oct
VT-PER-CO Elevators
2023 Oct
VT-CAT1-CO Elevators
2023 Aug
VT-CAT1-CO Elevators
2023 Jul
Boiler burning natural gas (Weil Mclain V800-A-5063), registration expired since Jul 2023
Clean Air Tracking System (boiler registrations)
2023 Apr
Low Pressure Boiler
DOB Violations
2008 Jun
Plumbing permit, Construction fence permit, Alteration permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2007 Apr
No active shed permit
DOB NOW: Build – Approved Permits
2007 Feb
Fire protection permit
2007 Jan
General construction permit
2007 Jan
Sprinklers permit, Plumbing permit
1996 Aug
Heating/ventilation permit
1996 May
Fire protection permit
1995 Apr
Plumbing permit
1900
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.