Building health · MANHATTAN, NY

44 W 75 St

built 1890 · 4 stories · 10 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Apr
Latest accepted inspection Apr 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Mar
Boiler burning natural gas (H.B. Smith 19-S-5), registration current since Mar 2025
Clean Air Tracking System (boiler registrations)
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2023 Nov
Other conditions class I · paperwork · closed
2022 Apr
No active shed permit; permits since Apr 2021, last expired Apr 2022
DOB NOW: Build – Approved Permits
2021 Mar
Plumbing permit
2020 Nov
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2006 Jan
General construction permit, Plumbing permit, Heating/ventilation permit
DOB NOW: Build – Approved Permits
2001 Apr
Plumbing permit, Heating/ventilation permit, General construction permit
1999 Jul
Latest boiler work permit 1999
DOB Permit Issuance (BIS)
1999 Jul
Boiler permit, Fuel burning permit
DOB NOW: Build – Approved Permits
1890
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.