Building health · MANHATTAN, NY
built 1901 · 5 stories · 20 apartments
Registered with the city: BERDAR EQUITIES LLC · 7 other buildings here list it; BERDAR EQUITIES, LLC
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Nov
Shed permit active now
DOB NOW: Build – Approved Permits
2026 May
Boiler burning No. 2 oil (Federal FST-20), registration current since May 2026
Clean Air Tracking System (boiler registrations)
2026 May
Supported scaffold permit
DOB NOW: Build – Approved Permits
2025 Sep
Latest accepted inspection Sep 2025, defects reported: no
DOB NOW: Safety Boiler
2022 Nov
0 open. 3 violations on record in all, 1987–2022 — the 0 most recent are listed here
Housing Maintenance Code Violations
2016 Jun
General construction permit
DOB NOW: Build – Approved Permits
2008 Sep
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2004 Jul
General construction permit, Construction fence permit
DOB NOW: Build – Approved Permits
2002 Aug
Plumbing permit, Fuel storage permit, Fuel burning permit, Boiler permit
2002 Aug
Latest boiler work permit 2002
DOB Permit Issuance (BIS)
1901
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.