Building health · MANHATTAN, NY
built 1869 · 6 stories · 8 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jan
PL-PER Gas Piping - LL152
DOB Violations
2025 Aug
VT-PER-CO Elevators
2025 Aug
Latest accepted inspection Aug 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Apr
1 active elevator; latest periodic inspection Apr 2025
DOB NOW Elevator Safety Compliance
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2023 Nov
Other conditions class I · paperwork · closed
2023 Oct
VT-CAT1-CO Elevators
DOB Violations
2020 Apr
No active shed permit; permits since Jan 2020, last expired Apr 2020
DOB NOW: Build – Approved Permits
2020 Jan
Supported scaffold permit
2018 Jul
General construction permit
2018 Jun
General construction permit
2018 May
General construction permit
2016 Jul
General construction permit
2011 Dec
Boiler burning natural gas (Weil Mclain Lgb 7 WEIL MCLAIN LGB 7), registration expired since Dec 2011
Clean Air Tracking System (boiler registrations)
2009 Jul
Latest boiler work permit 2009
DOB Permit Issuance (BIS)
2009 Jul
Plumbing permit, Boiler permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1998 Apr
Alteration permit
DOB NOW: Build – Approved Permits
1991 Dec
Alteration permit
1869
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.