Building health · MANHATTAN, NY
built 2004 · 18 stories · 149 apartments
Also known as 406 W 55 St, 408 W 55 St, 410 W 55 St, 839 9 Ave — one building, several doors.
Registered with the city: GOTHAM REAL ESTATE MANAGERS LLC; 55TH & 9TH LLC
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2027 Jan
Shed permit active now
DOB NOW: Build – Approved Permits
2026 Oct
AppliancesApt 3H
Housing Maintenance Code Complaints and Problems
2026 Aug
3 active elevators; latest periodic inspection Aug 2026
DOB NOW Elevator Safety Compliance
2026 Aug
General construction permit
DOB NOW: Build – Approved Permits
2026 Jun
PlumbingApt 3H class B
Housing Maintenance Code Violations
2026 Jun
Walls, floors and stairsApt 3H class B
2026 Jun
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2026 Jun
Doors and windowsApt 3H class A
Housing Maintenance Code Violations
2026 Jun
Leaks class A
2026 Jun
Walls, floors and stairs class A
2026 Jun
Walls, floors and stairs class A · paperwork
2026 Jun
Other conditions class A
2026 Jun
Smoke or CO detectors class A
2026 Jun
Fire safety class B
2026 Jun
Fire safety class B
2026 Jun
PlumbingApt 3H class B
2026 Jun
ElectricalApt 3H class A
2026 Jun
Walls, floors and stairsApt 3H class B
2026 Jun
Fire safety class C · closed
2026 Jun
Fire safetyApt 3H class C · closed
2026 Jun
Fire safetyApt 3H class C · closed
2026 Jun
General repairs, mold, pestsApt 3H
Housing Maintenance Code Complaints and Problems
2026 Jun
ElectricalApt 3H
2026 Jun
Latest accepted inspection Jun 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Mar
Electrical, floors or stairs, general repairs, paint or plaster, safetyApt 3H
Housing Maintenance Code Complaints and Problems
2026 Feb
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2025 Oct
Sign permit
2025 Oct
Sign permit
2025 Oct
Sign permit
2025 Oct
Sign permit
2025 Oct
Boiler burning natural gas (Laars NTV-600), registration current since Oct 2025
Clean Air Tracking System (boiler registrations)
2025 Feb
Plumbing permit
DOB NOW: Build – Approved Permits
2024 Aug
General construction permit
2022 Oct
Plumbing permit
2020 Jun
Safe (cycle 9, filed Jun 2020)
DOB NOW: Safety – Facades Compliance Filings
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2004
Built
PLUTO (tax lot data)
2003 Oct
Latest boiler work permit 2003
DOB Permit Issuance (BIS)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.