Building health · MANHATTAN, NY

398 3 Ave

built 1900 · 5 stories · 16 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jan
Heat or hot water
Housing Maintenance Code Complaints and Problems
2026 Jan
Heat or hot water
2025 Nov
Latest accepted inspection Nov 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2025 Aug
Heat or hot water
Housing Maintenance Code Complaints and Problems
2024 Dec
Heat or hot water
2024 Feb
Boiler burning No. 2 oil (H.B. Smith 19A-S/W-08), registration current since Feb 2024
Clean Air Tracking System (boiler registrations)
2019 Feb
Plumbing permit, General construction permit, Heating/ventilation permit
DOB NOW: Build – Approved Permits
2018 Aug
Plumbing permit, General construction permit, Heating/ventilation permit
2017 Dec
Plumbing permit, General construction permit, Heating/ventilation permit
2010 Jun
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2006 Feb
Latest boiler work permit 2006
DOB Permit Issuance (BIS)
1900
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.