Building health · BROOKLYN, NY
built 1920 · 4 stories · 3 apartments
Also known as 410 5 St — one building, several doors.
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jul
Latest accepted inspection Jul 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Dec
Boiler burning natural gas (Fulton FB-010A), registration current since Dec 2025
Clean Air Tracking System (boiler registrations)
2024 Oct
BE-EXT-HP Boiler
DOB Violations
2023 Jun
High Pressure Boiler
2023 Jun
High Pressure Boiler
2023 Apr
High Pressure Boiler
2021 Jun
Plumbing permit, Boiler permit
DOB NOW: Build – Approved Permits
2020 Nov
Plumbing permit
2020 Nov
Mechanical systems permit
2019 Oct
0 open. 1 violations on record in all, 2019
Housing Maintenance Code Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2002 Jul
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
1998 Nov
Heating/ventilation permit, General construction permit
1996 Mar
Latest boiler work permit 1996
DOB Permit Issuance (BIS)
1920
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.