Building health · MANHATTAN, NY
built 1940 · 5 stories · 12 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jun
Latest accepted inspection Jun 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2024 Apr
Pests class A · paperwork · closed
2023 Dec
No active shed permit; permits since Jun 2023, last expired Dec 2023
DOB NOW: Build – Approved Permits
2022 Mar
Boiler burning No. 2 oil (H.B. Smith 18-9), registration expired since Mar 2022
Clean Air Tracking System (boiler registrations)
2017 Oct
Construction fence permit, General construction permit
DOB NOW: Build – Approved Permits
2014 Nov
Fire protection permit
2014 Oct
General construction permit, Construction fence permit
2013 Nov
Fire protection permit
2008 Aug
Fuel storage permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1993 Feb
Heating/ventilation permit, Plumbing permit
DOB NOW: Build – Approved Permits
1992 Nov
Fire protection permit
1992 May
Construction non-hazardous · never closed
DOB Violations
1940
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.