Building health · BROOKLYN, NY
built 1930 · 3 stories · 2 apartments
Registered with the city: KAWACHI CORP
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2024 Sep
Low Pressure Boiler
DOB Violations
2024 Feb
Mechanical systems permit
DOB NOW: Build – Approved Permits
2023 Jun
Low Pressure Boiler
DOB Violations
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Jun
Low Pressure Boiler
2023 Apr
Low Pressure Boiler
2019 Nov
Low Pressure Boiler
2018 Jul
General construction permit, Plumbing permit
DOB NOW: Build – Approved Permits
2018 Apr
Low Pressure Boiler
DOB Violations
2018 Feb
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
2017 Feb
Low Pressure Boiler
DOB Violations
2015 Oct
Low Pressure Boiler never closed
2015 Mar
Low Pressure Boiler never closed
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2002 Jun
Fire protection permit
DOB NOW: Build – Approved Permits
1992 Jan
General construction permit, Fire protection permit
1930
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.