Building health · MANHATTAN, NY
built 1892 · 7 stories · 7 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Aug
1 active elevator; latest periodic inspection Aug 2026
DOB NOW Elevator Safety Compliance
2026 Jun
General construction permit
DOB NOW: Build – Approved Permits
2026 Jun
Mechanical systems permit
2026 Jun
Plumbing permit
2026 Apr
Safe (cycle 10, filed Apr 2026)
DOB NOW: Safety – Facades Compliance Filings
2025 Oct
No active shed permit; permits since Oct 2018, last expired Oct 2025
DOB NOW: Build – Approved Permits
2025 Aug
Latest accepted inspection Aug 2025, defects reported: no
DOB NOW: Safety Boiler
2024 Nov
General construction permit
DOB NOW: Build – Approved Permits
2024 Nov
Supported scaffold permit
2024 Aug
Boiler burning natural gas (Weil Mclain 980), registration current since Aug 2024
Clean Air Tracking System (boiler registrations)
2023 Jan
Plumbing permit
DOB NOW: Build – Approved Permits
2019 Oct
0 open. 2 violations on record in all, 2016–2019 — the 0 most recent are listed here
Housing Maintenance Code Violations
2018 Nov
General construction permit
DOB NOW: Build – Approved Permits
2018 Jul
Supported scaffold permit
2017 Jul
Heating/ventilation permit, General construction permit
2007 Sep
In a FEMA special flood hazard area: AE
FEMA National Flood Hazard Layer
2006 Oct
Latest boiler work permit 2006
DOB Permit Issuance (BIS)
1892
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.