Building health · BROOKLYN, NY
built 1931 · 3 stories · 3 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jul
1 active elevator; latest periodic inspection Jul 2026
DOB NOW Elevator Safety Compliance
2026 Feb
Alteration permit, Plumbing permit
DOB NOW: Build – Approved Permits
2026 Feb
General construction permit
2019 Aug
General construction permit
2012 Mar
General construction permit
2011 Jun
Lead-based paintApt 3 class C · never closed
Housing Maintenance Code Violations
2011 Jun
Lead-based paintApt 3 class C · never closed
2011 Jun
Walls, floors and stairsApt 3 class A · never closed
2011 Jun
Walls, floors and stairsApt 3 class A · never closed
2011 Jun
Walls, floors and stairsApt 3 class A · never closed
2010 May
Construction never closed
DOB Violations
2009 Jun
Smoke or CO detectorsApt 3W class B · never closed
Housing Maintenance Code Violations
2009 Jun
Doors and windows class A · never closed
2009 Jun
Fire safety class B · never closed
2009 Jun
Fire safetyApt 3W class B · never closed
2009 Apr
Construction fence permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2001 Mar
Quality of Life hazardous · never closed
DOB Violations
1997 Jun
Construction non-hazardous · never closed
1997 Jun
Construction hazardous · never closed
1931
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.