Building health · MANHATTAN, NY
built 1965 · 20 stories · 258 apartments
Also known as 115 E 9 St, 32 3 Ave, 34 3 Ave, 36 3 Ave, 42 3 Ave, 46 3 Ave, 92 E 10 St — one building, several doors.
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Oct
Plumbing permit
DOB NOW: Build – Approved Permits
2026 Jun
Plumbing permit
2026 Jun
EN-BENCH Benchmarking - LL84
DOB Violations
2026 Mar
3 active elevators; latest periodic inspection Mar 2026
DOB NOW Elevator Safety Compliance
2026 Jan
General construction permit
DOB NOW: Build – Approved Permits
2025 Nov
Structural permit
2025 Sep
Boiler burning No. 2 oil (Easco FPS-200), registration current since Sep 2025
Clean Air Tracking System (boiler registrations)
2025 Sep
Heat or hot water
Housing Maintenance Code Complaints and Problems
2025 Aug
Latest accepted inspection Aug 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Aug
Safe with a repair and maintenance program (cycle 10, filed Aug 2025)
DOB NOW: Safety – Facades Compliance Filings
2025 Jun
PestsApt 825
Housing Maintenance Code Complaints and Problems
2025 Jun
PestsApt 862
2025 Jun
Plumbing permit
DOB NOW: Build – Approved Permits
2025 Jun
Plumbing permit
2025 May
General construction permit
2025 Apr
PestsApt 824
Housing Maintenance Code Complaints and Problems
2025 Apr
PestsApt 825
2025 Apr
PestsApt 862
2025 Apr
PestsApt 824
2025 Jan
PestsApt 824
2025 Jan
PestsApt 825
2025 Jan
Heat or hot waterApt 14L
2024 Dec
General construction permit
DOB NOW: Build – Approved Permits
2024 Nov
Heat or hot waterApt 19E
Housing Maintenance Code Complaints and Problems
2024 Nov
Heat or hot waterApt 2R
2024 Nov
Heat or hot waterApt 4D
2024 Oct
General construction permit
DOB NOW: Build – Approved Permits
2024 Sep
General construction permit
2024 Mar
Heat or hot water
Housing Maintenance Code Complaints and Problems
2023 Nov
BE-EXT-LP Boiler
DOB Violations
2023 Nov
BE-EXT-LP Boiler
2023 Nov
BE-EXT-LP Boiler
2023 Oct
VT-CAT1-CO Elevators
2023 Oct
VT-CAT1-CO Elevators
2023 Mar
No active shed permit; permits since Feb 2020, last expired Mar 2023
DOB NOW: Build – Approved Permits
2022 Feb
No Report And / Or Late Filing (Facade)
DOB Violations
2021 Mar
Latest boiler work permit 2021
DOB Permit Issuance (BIS)
2019 Sep
(Other Bldgs Types) - Elevator Affirmation Of Correction
DOB Violations
2019 Jun
Construction
2018 Jul
Electrical class B
Housing Maintenance Code Violations
2017 Jan
(Other Bldgs Types) - Elevator Affirmation Of Correction
DOB Violations
2017 Jan
(Other Bldgs Types) - Elevator Affirmation Of Correction
2017 Jan
(Other Bldgs Types) - Elevator Affirmation Of Correction
2016 Jan
Walls, floors and stairs class A · never closed
Housing Maintenance Code Violations
2015 May
Facade Safety Program never closed
DOB Violations
2011 Feb
Fail To Certify Class 1 never closed
2010 Dec
Fail To Certify Class 1 never closed
2010 Dec
Fail To Certify Class 1 never closed
2010 Dec
Fail To Certify Class 1 never closed
2009 Jul
Smoke or CO detectorsApt 16H class B · never closed
Housing Maintenance Code Violations
2009 Jul
Smoke or CO detectorsApt 16H class B · never closed
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1994 Jun
Fire safetyApt 3G class B · never closed
Housing Maintenance Code Violations
1965
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.