Building health · MANHATTAN, NY
built 1899 · 5 stories · 16 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Oct
Latest accepted inspection Oct 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Mar
Boiler burning natural gas (H.B. Smith G-19-S-5), registration current since Mar 2024
Clean Air Tracking System (boiler registrations)
2016 Feb
General construction permit
DOB NOW: Build – Approved Permits
2012 Jun
Plumbing permit, General construction permit
2012 May
Plumbing permit, General construction permit
2012 Feb
Plumbing permit, General construction permit
2011 Nov
Latest boiler work permit 2011 (2 on record)
DOB Permit Issuance (BIS)
2011 Nov
Plumbing permit
DOB NOW: Build – Approved Permits
2011 Nov
Fuel burning permit, Boiler permit
2007 Sep
0 open. 1 violations on record in all, 2007 — the 0 most recent are listed here
Housing Maintenance Code Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1899
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.