Building health · MANHATTAN, NY
built 2002 · 7 stories · 5 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Apr
Latest accepted inspection Apr 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Mar
1 active elevator; latest periodic inspection Mar 2026
DOB NOW Elevator Safety Compliance
2025 Nov
Boiler burning natural gas (Weil Mclain GV-6), registration current since Nov 2025
Clean Air Tracking System (boiler registrations)
2024 Jun
No active shed permit; permits since Dec 2023, last expired Jun 2024
DOB NOW: Build – Approved Permits
2024 May
Safe (cycle 9, filed May 2024)
DOB NOW: Safety – Facades Compliance Filings
2024 Jan
General construction permit
DOB NOW: Build – Approved Permits
2023 Dec
Supported scaffold permit
2023 Mar
0 open. 2 violations on record in all, 2022–2023 — the 0 most recent are listed here
Housing Maintenance Code Violations
2019 May
Heating/ventilation permit
DOB NOW: Build – Approved Permits
2018 May
Sign permit
2018 May
General construction permit
2018 May
Plumbing permit, General construction permit
2018 Apr
Heating/ventilation permit, General construction permit, Sprinklers permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2003 Mar
Latest boiler work permit 2003
DOB Permit Issuance (BIS)
2002
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.