Building health · MANHATTAN, NY
built 1906 · 5 stories · 10 apartments
Registered with the city: 287-289 WEST FOURTH LLC
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 May
Latest accepted inspection May 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Oct
Boiler burning natural gas (Federal FST-32), registration current since Oct 2024
Clean Air Tracking System (boiler registrations)
2018 Sep
Latest boiler work permit 2018
DOB Permit Issuance (BIS)
2018 Sep
Boiler permit
DOB NOW: Build – Approved Permits
2013 Jul
Plumbing permit, General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2001 Jul
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
1996 Mar
Plumbing permit, General construction permit
1906
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.