Building health · MANHATTAN, NY
built 1991 · 10 stories · 164 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Aug
2 active elevators; latest periodic inspection Aug 2026
DOB NOW Elevator Safety Compliance
2025 Nov
Structural permit
DOB NOW: Build – Approved Permits
2025 Aug
Latest accepted inspection Aug 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Apr
Boiler burning natural gas (Pvi 2000-PHE-250-ATP), registration current since Apr 2025
Clean Air Tracking System (boiler registrations)
2024 Jul
No active shed permit; permits since Feb 2024, last expired Jul 2024
DOB NOW: Build – Approved Permits
2024 Apr
Safe (cycle 9, filed Apr 2024)
DOB NOW: Safety – Facades Compliance Filings
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2024 Mar
Suspended scaffold permit
DOB NOW: Build – Approved Permits
2024 Feb
General construction permit
2023 Feb
Failure To Correct Swarmp Conditions (Facade)
DOB Violations
2022 Jul
Antenna permit
DOB NOW: Build – Approved Permits
2018 Dec
General construction permit
2014 Oct
General construction permit
2012 Jul
General construction permit
2009 Jul
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2006 Nov
General construction permit
DOB NOW: Build – Approved Permits
2006 Sep
General construction permit
1991
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.