Building health · MANHATTAN, NY

237 W 100 St

built 1903 · 4 stories · 8 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Apr
Latest accepted inspection Apr 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Jan
Boiler burning No. 2 oil (H.B. Smith 19HE-S/W-10), registration current since Jan 2026
Clean Air Tracking System (boiler registrations)
2025 Nov
Plumbing permit
DOB NOW: Build – Approved Permits
2025 Apr
General construction permit
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2015 Feb
0 open. 1 violations on record in all, 2015 — the 0 most recent are listed here
Housing Maintenance Code Violations
2012 Feb
Plumbing permit, General construction permit
DOB NOW: Build – Approved Permits
2004 Nov
Latest boiler work permit 2004
DOB Permit Issuance (BIS)
2004 Nov
Fuel burning permit, Boiler permit
DOB NOW: Build – Approved Permits
1903
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.