Building health · MANHATTAN, NY
built 1910 · 5 stories · 8 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2026 Mar
Latest accepted inspection Mar 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Dec
MoldApt 3A class B · closed
Housing Maintenance Code Violations
2025 Mar
MoldApt 3A class B
2025 Jan
Mechanical systems permit
DOB NOW: Build – Approved Permits
2023 Feb
Plumbing permit
2023 Feb
General construction permit
2011 Jun
Plumbing permit, Alteration permit
2010 Apr
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2006 Sep
Latest boiler work permit 2006 (2 on record)
DOB Permit Issuance (BIS)
2006 Sep
Boiler permit
DOB NOW: Build – Approved Permits
2006 Apr
No active shed permit
2006 Mar
Alteration permit
2006 Mar
Sprinklers permit, Plumbing permit
1992 Oct
Boiler burning No. 2 oil (H.B.Smith 19-S-7 H.B.SMITH 19-S-7), registration expired since Oct 1992
Clean Air Tracking System (boiler registrations)
1989 Sep
Walls, floors and stairsApt 7 class A · never closed
Housing Maintenance Code Violations
1910
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.