Building health · MANHATTAN, NY
built 1900 · 4 stories · 3 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2025 Dec
Latest accepted inspection Dec 2025, defects reported: no
DOB NOW: Safety Boiler
2023 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2011 Jul
Sign permit
DOB NOW: Build – Approved Permits
2011 Jul
Sign permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2004 Jul
Fire protection permit
DOB NOW: Build – Approved Permits
2004 Feb
Plumbing permit, General construction permit
2003 Jul
Electrical class B · never closed
Housing Maintenance Code Violations
2002 Jan
Latest boiler work permit 2002
DOB Permit Issuance (BIS)
2002 Jan
Plumbing permit, Boiler permit
DOB NOW: Build – Approved Permits
2001 Oct
Plumbing permit, Heating/ventilation permit, General construction permit
1979 Sep
Walls, floors and stairs class A · paperwork · never closed
Housing Maintenance Code Violations
1979 Sep
Electrical class A · never closed
1979 Sep
Other conditions class B · never closed
1976 Jun
Other conditions class C · never closed
1975 Jun
Walls, floors and stairs class C · never closed
1975 Jun
Fire safety class B · never closed
1975 Jun
Other conditions class B · never closed
1975 Jan
Walls, floors and stairs class A · never closed
1900
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.