Building health · MANHATTAN, NY

227 Waverly Pl

built 1910 · 6 stories · 30 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Boiler burning No. 2 oil (Federal FST-40), registration current since Sep 2026
Clean Air Tracking System (boiler registrations)
2026 Mar
Floors or stairsApt 1A
Housing Maintenance Code Complaints and Problems
2026 Feb
PlumbingApt 1B
2026 Jan
Latest accepted inspection Jan 2026, defects reported: no
DOB NOW: Safety Boiler
2023 Feb
No active shed permit; permits since Feb 2022, last expired Feb 2023
DOB NOW: Build – Approved Permits
2022 Dec
Mechanical systems permit
2022 Mar
0 open. 86 violations on record in all, 1986–2022 — the 0 most recent are listed here
Housing Maintenance Code Violations
2021 Nov
General construction permit
DOB NOW: Build – Approved Permits
2021 Aug
General construction permit
2017 Jun
Plumbing permit, General construction permit
2016 Jun
Plumbing permit, Heating/ventilation permit, General construction permit
2015 May
Heating/ventilation permit, General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1991 Jan
Latest boiler work permit 1991
DOB Permit Issuance (BIS)
1910
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.