Building health · MANHATTAN, NY

225 Sullivan St

built 1887 · 5 stories · 12 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Aug
Other conditions class A
Housing Maintenance Code Violations
2026 Aug
Fire safetyApt 3C class C
2026 Aug
LeaksApt 3C class B
2026 Aug
Walls, floors and stairsApt 3C class B
2026 Aug
Walls, floors and stairsApt 3C class B
2026 Aug
MoldApt 3C class A
2026 Aug
LeaksApt 3C class B
2026 Aug
Mold, leaksApt 3C
Housing Maintenance Code Complaints and Problems
2026 Jul
Walls, floors and stairsApt 1A class B
Housing Maintenance Code Violations
2025 Jul
Walls, floors and stairs class A
2025 Jul
MoldApt 1A class B
2025 Jul
Smoke or CO detectors class A · closed
2025 Jul
Smoke or CO detectors class A · closed
2025 Jul
Walls, floors and stairs class A · closed
2025 Jul
Fire safety class B · closed
2025 Jul
Fire safety class B · closed
2025 Jul
Fire safetyApt 1A class C · closed
2025 Jul
Walls, floors and stairsApt 1A class A · closed
2025 Jun
Latest accepted inspection Jun 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Jun
MoldApt 1A class B
Housing Maintenance Code Violations
2025 Jun
Heat or hot water class C · paperwork
2025 Jun
PlumbingApt 1A class A
2025 Jun
Walls, floors and stairs class A · closed
2025 Jun
Smoke or CO detectors class A · closed
2025 Jun
Smoke or CO detectors class A · closed
2025 Jun
MoldApt 1A class A · closed
2025 Jun
Fire safetyApt 1A class C · closed
2025 Jun
GasApt 1A class C · closed
2025 Apr
AppliancesApt 1A
Housing Maintenance Code Complaints and Problems
2025 Mar
General repairsApt 1A
2022 Aug
Plumbing permit
DOB NOW: Build – Approved Permits
2022 Aug
General construction permit
2022 Apr
Boiler burning No. 2 oil (H.B. Smith 19-6), registration expired since Apr 2022
Clean Air Tracking System (boiler registrations)
2018 May
No active shed permit; permits since May 2017, last expired May 2018
DOB NOW: Build – Approved Permits
2017 May
Scaffold permit
2014 May
Low Pressure Boiler never closed
DOB Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2007 Jun
General construction permit
DOB NOW: Build – Approved Permits
2002 Jul
Construction non-hazardous · never closed
DOB Violations
2000 Sep
Latest boiler work permit 2000
DOB Permit Issuance (BIS)
2000 Sep
Fuel storage permit, Fuel burning permit, Boiler permit
DOB NOW: Build – Approved Permits
1887
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.