Building health · MANHATTAN, NY

2129 2 Ave

built 1900 · 4 stories · 3 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jul
Latest accepted inspection Jul 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Jul
Foundation permit
DOB NOW: Build – Approved Permits
2026 May
AppliancesApt 1
Housing Maintenance Code Complaints and Problems
2026 Apr
Boiler burning No. 2 oil (H.B. Smith 19-7), registration current since Apr 2026
Clean Air Tracking System (boiler registrations)
2026 Feb
Structural permit, General construction permit, Foundation permit
DOB NOW: Build – Approved Permits
2025 Jun
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2025 Jan
PL-PER Gas Piping - LL152
DOB Violations
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2023 Nov
Other conditions class I · paperwork · closed
2014 May
Low Pressure Boiler never closed
DOB Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X (0.2% annual chance)
FEMA National Flood Hazard Layer
2004 Dec
Electrical class B · never closed
Housing Maintenance Code Violations
1995 Dec
Latest boiler work permit 1995
DOB Permit Issuance (BIS)
1995 Dec
Fuel storage permit, Fuel burning permit, Boiler permit
DOB NOW: Build – Approved Permits
1979 Feb
Leaks class C · never closed
Housing Maintenance Code Violations
1900
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.