Building health · MANHATTAN, NY
built 1910 · 4 stories · 3 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Apr
Latest accepted inspection Apr 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Dec
Heat or hot waterApt 2
Housing Maintenance Code Complaints and Problems
2023 Mar
0 open. 6 violations on record in all, 2016–2023 — the 0 most recent are listed here
Housing Maintenance Code Violations
2019 Feb
Plumbing permit, Heating/ventilation permit, General construction permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2007 Feb
Latest boiler work permit 2007
DOB Permit Issuance (BIS)
2007 Feb
Plumbing permit, Boiler permit
DOB NOW: Build – Approved Permits
1997 Jul
General construction permit
1995 Feb
Plumbing permit, Fire protection permit, Heating/ventilation permit, General construction permit
1910
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.