Building health · MANHATTAN, NY
built 1899 · 6 stories · 24 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 May
Latest accepted inspection May 2026, defects reported: no
DOB NOW: Safety Boiler
2024 Jun
Boiler burning natural gas (H.B. Smith 28-5), registration current since Jun 2024
Clean Air Tracking System (boiler registrations)
2015 Nov
0 open. 2 violations on record in all, 1986–2015 — the 0 most recent are listed here
Housing Maintenance Code Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2002 Oct
General construction permit
DOB NOW: Build – Approved Permits
2002 Apr
Plumbing permit, General construction permit
2001 Apr
Plumbing permit, General construction permit
2001 Mar
Plumbing permit, General construction permit
2001 Feb
Plumbing permit, General construction permit
1999 Jul
Plumbing permit
1899
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.