2026 Jun
Sprinklers permit
DOB NOW: Build – Approved Permits
2026 May
Mechanical systems permit
2026 Feb
Plumbing permit
2026 Jan
Structural permit, General construction permit
2025 Dec
Latest accepted inspection Dec 2025, defects reported: no
DOB NOW: Safety Boiler
2025 Apr
1 active elevator; latest periodic inspection Apr 2025
DOB NOW Elevator Safety Compliance
2025 Feb
Boiler burning No. 2 oil (H.B. Smith 19A-S-7), registration current since Feb 2025
Clean Air Tracking System (boiler registrations)
2024 Jan
Mechanical systems permit
DOB NOW: Build – Approved Permits
2023 Jun
Low Pressure Boiler
DOB Violations
2020 Feb
General construction permit
DOB NOW: Build – Approved Permits
2019 Nov
Plumbing permit
2019 Sep
Heating/ventilation permit, General construction permit
2014 Feb
No active shed permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2003 Dec
Latest boiler work permit 2003
DOB Permit Issuance (BIS)
1893
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.