Building health · MANHATTAN, NY
built 1900 · 5 stories · 47 apartments on its tax lot
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Mar
Aeu-Haz Aeuhaz
DOB Violations
2025 Dec
1 active elevator; latest periodic inspection Dec 2025
DOB NOW Elevator Safety Compliance
2025 Oct
VT-CAT1-CO Elevators
DOB Violations
2025 Jul
Construction class - 1
2025 Jun
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2025 Mar
No active shed permit; permits since Apr 2024, last expired Mar 2025
DOB NOW: Build – Approved Permits
2024 Oct
Safe (cycle 9, filed Oct 2024)
DOB NOW: Safety – Facades Compliance Filings
2024 Aug
General construction permit
DOB NOW: Build – Approved Permits
2024 Aug
Structural permit
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2021 May
Latest accepted inspection May 2021, defects reported: no
DOB NOW: Safety Boiler
2020 Jul
Sign permit
DOB NOW: Build – Approved Permits
2019 Dec
Heating/ventilation permit
2019 Jul
Sign permit
2017 Apr
General construction permit
2016 Apr
Sign permit
2016 Apr
Sign permit
2016 Apr
Sign permit
2016 Apr
Sign permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2003 Jun
Boiler burning none ( ), registration expired since Jun 2003
Clean Air Tracking System (boiler registrations)
1997 Jan
Local Law 10/81 - Elevator never closed
DOB Violations
1900
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.