Building health · MANHATTAN, NY
built 1961 · 6 stories · 55 apartments
Registered with the city: 205 WEST 13TH LLC; 205 WEST 13TH LLC C/O
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Jun
Doors and windows class B · closed
Housing Maintenance Code Violations
2026 Apr
1 active elevator; latest periodic inspection Apr 2026
DOB NOW Elevator Safety Compliance
2026 Apr
Latest accepted inspection Apr 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Feb
Heat or hot water
Housing Maintenance Code Complaints and Problems
2025 Dec
PlumbingApt 1H
2025 Dec
General repairsApt 7E
2025 Dec
Heat or hot waterApt 1H
2025 Oct
Heat or hot waterApt 3A
2025 May
Mechanical systems permit, General construction permit
DOB NOW: Build – Approved Permits
2025 May
Heat or hot water
Housing Maintenance Code Complaints and Problems
2025 May
Heat or hot waterApt 3A
2025 May
Heat or hot water
2025 May
Heat or hot waterApt 3A
2025 May
Heat or hot waterApt 3A
2025 Apr
Heat or hot waterApt 3A
2025 Mar
Heat or hot waterApt 3A
2025 Feb
Fire safety class C · closed
Housing Maintenance Code Violations
2025 Feb
Fire safetyApt 3A class C · closed
2025 Feb
Smoke or CO detectorsApt 3A class B · closed
2025 Feb
Smoke or CO detectorsApt 3A class B · closed
2025 Feb
Heat or hot waterApt 3A
Housing Maintenance Code Complaints and Problems
2025 Feb
Heat or hot water class C · closed
Housing Maintenance Code Violations
2025 Feb
Heat or hot waterApt 3A class C · closed
2025 Feb
Heat or hot waterApt 3A
Housing Maintenance Code Complaints and Problems
2025 Feb
Heat or hot waterApt 3A
2025 Feb
Heat or hot waterApt 3A
2024 Dec
Heat or hot waterApt 1E
2024 Jun
Boiler burning natural gas (Federal FST-60), registration current since Jun 2024
Clean Air Tracking System (boiler registrations)
2023 Oct
VT-CAT1-CO Elevators
DOB Violations
2023 Feb
Safe (cycle 9, filed Feb 2023)
DOB NOW: Safety – Facades Compliance Filings
2022 Dec
Plumbing permit
DOB NOW: Build – Approved Permits
2022 Dec
General construction permit
2022 Jul
Plumbing permit
2022 May
Plumbing permit
2022 May
General construction permit
2022 Mar
General construction permit
2022 Feb
No active shed permit; permits since Feb 2021, last expired Feb 2022
2021 Jun
General construction permit
2020 Jun
Plumbing permit
2018 Jul
No Report And / Or Late Filing (Facade)
DOB Violations
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2003 Dec
Latest boiler work permit 2003
DOB Permit Issuance (BIS)
1997 Jan
Local Law 10/81 - Elevator never closed
DOB Violations
1961
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.