Building health · MANHATTAN, NY

2024 3 Ave

built 1910 · 4 stories · 9 apartments

The building’s record over time

Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Mar
Latest accepted inspection Mar 2026, defects reported: no
DOB NOW: Safety Boiler
2023 Dec
Boiler burning No. 2 oil (H.B. Smith 19-S-6), registration current since Dec 2023
Clean Air Tracking System (boiler registrations)
2018 Apr
0 open. 21 violations on record in all, 1992–2018 — the 0 most recent are listed here
Housing Maintenance Code Violations
2014 May
Low Pressure Boiler never closed
DOB Violations
2011 Sep
No active shed permit
DOB NOW: Build – Approved Permits
2011 Mar
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X, X (0.2% annual chance)
FEMA National Flood Hazard Layer
2002 Dec
Latest boiler work permit 2002
DOB Permit Issuance (BIS)
2002 Dec
Fuel storage permit, Fuel burning permit, Boiler permit
DOB NOW: Build – Approved Permits
1910
Built
PLUTO (tax lot data)
See all records and sources
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.