Building health · MANHATTAN, NY
built 2025 · 18 stories · 18 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Dec
Shed permit active now
DOB NOW: Build – Approved Permits
2026 Oct
General construction permit
2026 Oct
General construction permit
2026 Jul
Protection and mechanical methods permit
2026 Jul
Construction fence permit
2026 Jun
Protection and mechanical methods permit
2026 Jun
Protection and mechanical methods permit
2026 Mar
Standpipe permit
2026 Mar
Standpipe permit, Sprinklers permit
2026 Mar
Plumbing permit
2025
Built
PLUTO (tax lot data)
2024 Sep
Low Pressure Boiler
DOB Violations
2023 Apr
Low Pressure Boiler
2019 Aug
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2017 Sep
Latest boiler work permit 2017 (4 on record)
DOB Permit Issuance (BIS)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.