Building health · MANHATTAN, NY

200 Haven Ave

built 1941 · 6 stories · 95 apartments

Apartments named in these records

23 of this building’s 95 apartments are named in a city record. The rest have no record naming them, which is the usual case.

These are city records about an apartment, not about anyone who lives or lived there. They may not be used to screen a tenant.

Fire and safety

Issues on record

Structure and facade

Issues on record
What has happened here
2026 Jul
Walls, floors and stairsApt 3E class B · HPD violation
2026 Jul
Walls, floors and stairsApt 3E class B · HPD violation
2026 Jul
Walls, floors and stairsApt 3E class B · HPD violation
2026 Jun
Walls, floors and stairsApt 4P class B · HPD violation
2026 Mar
Doors and windowsApt 4P class C · closed · HPD violation
2025 Nov
Walls, floors and stairsApt 6S class B · closed · HPD violation
Show 25 more
2025 Nov
Walls, floors and stairsApt 6S class A · closed · HPD violation
2025 Nov
Walls, floors and stairsApt 6S class B · closed · HPD violation
2025 Nov
Walls, floors and stairsApt 6S class A · closed · HPD violation
2025 Nov
Walls, floors and stairsApt 6S class B · closed · HPD violation
2025 Nov
Walls, floors and stairsApt 2D class B · HPD violation
2025 Sep
Walls, floors and stairsApt 5P class B · HPD violation
2025 Sep
Walls, floors and stairsApt 5P class B · HPD violation
2025 Sep
Walls, floors and stairsApt 5P class B · HPD violation
2025 Sep
Walls, floors and stairsApt 5P class B · HPD violation
2025 Sep
Doors and windowsApt 5P class B · HPD violation
2025 Sep
Walls, floors and stairsApt 5P class B · HPD violation
2025 Aug
Walls, floors and stairsApt 5P class C · closed · HPD violation
2025 Aug
Walls, floors and stairsApt 5P class C · closed · HPD violation
2025 Aug
Walls, floors and stairsApt 5P class B · HPD violation
2025 Aug
Construction class - 2 · DOB violation
2025 Apr
Walls, floors and stairsApt 2H class B · HPD violation
2025 Feb
Construction class - 2 · DOB violation
2025 Jan
General construction permit
2024 May
Construction class - 2 · DOB violation
2024 Mar
Construction class - 1 · DOB violation
2024 Mar
Construction class - 1 · DOB violation
2024 Mar
Construction DOB violation
2023 Jul
General construction permit
2022 Dec
Retaining Wall DOB violation
2021 Mar
General construction permit
  • Facade ratingnot requiredNot required: facade inspections apply only to buildings taller than 6 stories
  • Sidewalk shed and scaffoldingfoundNo active shed permit; permits since Jan 2025, last expired Jan 2026
  • Landmark statusno recordNot in a historic district on record

Heat and hot water

Issues on record · 34 complaints, 2024–2026 · 31 in the past year
Heat source

Boiler burning natural gas (Rockmills MP-200), registration current since May 2025

Clean Air Tracking System (boiler registrations), as of 2026-10-19 · See this building's boiler registrations on NYC Open Data →
Boiler inspection filings

Latest accepted inspection Apr 2026, defects reported: no

DOB NOW: Safety Boiler, as of 2026-10-17 · See the boiler filings at DOB →
What this counts

Accepted annual boiler inspection filings, any date

Boiler work permits

Latest boiler work permit 1992

DOB Permit Issuance (BIS), as of 2026-10-17
What this counts

DOB boiler permits (BIS and DOB NOW); a permit dates work, not the boiler's age

Heat and hot water complaints

33 heat or hot water complaints

Housing Maintenance Code Complaints and Problems, as of 2026-10-18 · See the complaints at HPD Online →
What this counts

HPD complaints, heat season 2025–26 (Oct 1–May 31)

Water and pipes

Issues on record · 7 complaints, 2025–2026 · 1 in the past year

Pests and cleanliness

Issues on record · 26 complaints, 2025–2026 · 11 in the past year
What has happened here
2026 Oct
MoldApt 2J complaint
2026 Sep
MoldApt 6L complaint
2026 Jul
MoldApt 2J complaint
2026 Jul
MoldApt 3E class B · HPD violation
2026 Jul
MoldApt 3E class A · HPD violation
2026 Jul
MoldApt 3E complaint
Show 42 more
2026 Jun
MoldApt 3E complaint
2026 Jun
MoldApt 3E complaint
2026 Feb
MoldApt 2D class B · HPD violation
2026 Feb
PestsApt 2D class C · closed · HPD violation
2026 Feb
MoldApt 2D class A · closed · HPD violation
2026 Feb
MoldApt 2D complaint
2025 Dec
PestsApt 1C complaint
2025 Nov
MoldApt 6S class A · closed · HPD violation
2025 Nov
MoldApt 6S complaint
2025 Nov
MoldApt 2D class B · HPD violation
2025 Oct
MoldApt 2D complaint
2025 Oct
MoldApt 6S complaint
2025 Sep
PestsApt 5P complaint
2025 Sep
PestsApt 5P class C · closed · HPD violation
2025 Sep
PestsApt 5P complaint
2025 Sep
PestsApt 5P class C · closed · HPD violation
2025 Aug
PestsApt 5P complaint
2025 Aug
Rubbish and cleanliness class B · HPD violation
2025 Aug
Pests class B · closed · HPD violation
2025 Aug
PestsApt 5P class C · closed · HPD violation
2025 Aug
PestsApt 5P class C · closed · HPD violation
2025 Aug
PestsApt 5P class B · closed · HPD violation
2025 Aug
PestsApt 5P class C · closed · HPD violation
2025 Aug
PestsApt 5P class C · closed · HPD violation
2025 Aug
PestsApt 5P complaint
2025 Aug
PestsApt 5P complaint
2025 Aug
PestsApt 5P complaint
2025 Aug
PestsApt 5P complaint
2025 Jul
Unsanitary conditions, pestsApt BASEME complaint
2025 Jul
Mold, pestsApt 5P complaint
2025 Jul
Unsanitary conditionsApt 5P complaint
2025 Jul
PestsApt 5P complaint
2025 Jul
Unsanitary conditionsApt 5P complaint
2025 Jul
PestsApt 5P complaint
2025 Mar
MoldApt 2H complaint
2025 Jan
MoldApt 6P complaint
2024 Aug
MoldApt 6N complaint
2024 Aug
MoldApt 6N complaint
2024 May
PestsApt 2A complaint
2024 May
PestsApt 6D complaint
2023 Nov
PestsApt 2A complaint
2023 Oct
PestsApt 5P complaint

Electrical

2 complaints, 2024–2026 · 1 in the past year

Flooding

No issues on record
FEMA flood zone

Outside FEMA's 1% annual-chance flood zone: X

FEMA National Flood Hazard Layer, as of 2026-10-19
What this counts

Effective FIRM zones touching the building footprint

Stormwater flooding

Extreme storm, 2080 sea levels: Not in mapped flooding; Moderate storm, 2050 sea levels: Not in mapped flooding; Moderate storm, today's sea levels: Not in mapped flooding; Limited storm, today's sea levels: Not loaded (file format unreadable)

NYC Stormwater Flood Maps, as of 2024-07-03
What this counts

Mapped ponding touching the building footprint

BasementWhole tax lot

Below grade

PLUTO (tax lot data), as of 2026-08-24

Elevators

Issues on record, most recently 2023

Rent and tenancy

On the state list
Rent stabilization

On the state's list of buildings with at least one rent-stabilized apartment (2024 registrations)

Rent Stabilized Building Lists (2024 HCR registrations), as of 2025-11-30
What this counts

The list doesn't say which apartments are stabilized, and being listed isn't proof of current status. For a specific apartment, request its rent history from HCR

Energy

Energy

ENERGY STAR score 87 (2024 report)

Energy and Water Data Disclosure (Local Law 84), as of 2025-11-25
What this counts

Letter grades are issued by the city under Local Law 33 and posted near the building entrance; Blueflo shows the reported score only

General condition and all records

HPD violations

71 open: 71 about building conditions — walls, floors and stairs (44), leaks (10), pests (7), mold (5); 8 immediately hazardous (class C). 25 further violations from 2025–2026 were closed. 243 violations on record in all, 2000–2026 — the 126 most recent are listed here

2026 Oct
Fire safetyApt 6L class C
2026 Jul
LeaksApt 3E class B
2026 Jul
Walls, floors and stairsApt 3E class B
2026 Jul
Walls, floors and stairsApt 3E class B
2026 Jul
MoldApt 3E class B
2026 Jul
Walls, floors and stairsApt 3E class B
2026 Jul
MoldApt 3E class A
2026 Jul
Fire safetyApt 3E class C · closed
Show 42 more
2026 Jun
Walls, floors and stairsApt 4P class B
2026 Mar
Doors and windowsApt 4P class C · closed
2026 Mar
LeaksApt 4P class B · closed
2026 Feb
MoldApt 2D class B
2026 Feb
PestsApt 2D class C · closed
2026 Feb
MoldApt 2D class A · closed
2025 Dec
Heat or hot water class C · closed
2025 Dec
Heat or hot waterApt 1L class C · closed
2025 Nov
Walls, floors and stairsApt 6S class B · closed
2025 Nov
Walls, floors and stairsApt 6S class A · closed
2025 Nov
Walls, floors and stairsApt 6S class B · closed
2025 Nov
Walls, floors and stairsApt 6S class A · closed
2025 Nov
Walls, floors and stairsApt 6S class B · closed
2025 Nov
MoldApt 6S class A · closed
2025 Nov
Walls, floors and stairsApt 2D class B
2025 Nov
MoldApt 2D class B
2025 Nov
Smoke or CO detectorsApt 2D class B · closed
2025 Nov
Smoke or CO detectorsApt 2D class B · closed
2025 Sep
Walls, floors and stairsApt 5P class B
2025 Sep
Walls, floors and stairsApt 5P class B
2025 Sep
Walls, floors and stairsApt 5P class B
2025 Sep
LeaksApt 5P class B
2025 Sep
Walls, floors and stairsApt 5P class B
2025 Sep
LeaksApt 5P class B
2025 Sep
PestsApt 5P class C · closed
2025 Sep
Doors and windowsApt 5P class B
2025 Sep
Walls, floors and stairsApt 5P class B
2025 Sep
PestsApt 5P class C · closed
2025 Aug
Rubbish and cleanliness class B
2025 Aug
LeaksApt 5P class B
2025 Aug
LeaksApt 5P class B
2025 Aug
Pests class B · closed
2025 Aug
Walls, floors and stairsApt 5P class C · closed
2025 Aug
Walls, floors and stairsApt 5P class C · closed
2025 Aug
PestsApt 5P class C · closed
2025 Aug
PestsApt 5P class C · closed
2025 Aug
PestsApt 5P class B · closed
2025 Aug
Walls, floors and stairsApt 5P class B
2025 Aug
LeaksApt 5P class B
2025 Aug
PestsApt 5P class C · closed
2025 Aug
PestsApt 5P class C · closed
2025 Apr
Walls, floors and stairsApt 2H class B
and 21 more at the source
Housing Maintenance Code Violations, as of 2026-10-18 · Read these violations in full at HPD Online →
What this counts

Open HPD violations inspected in the last 10 years; class C = immediately hazardous. Paperwork = failure to file, notify or certify

Resident complaints to the city

34 heat or hot water, 33 paint or plaster, 13 mold, 12 pests, 6 doors or windows, 6 leaks, 3 unsanitary conditions, 2 electrical, 2 general repairs, 2 plumbing, 1 floors or stairs

2026 Oct
Doors or windowsApt 2J
2026 Oct
MoldApt 2J
2026 Sep
MoldApt 6L
2026 Jul
Doors or windows, moldApt 2J
2026 Jul
General repairs, paint or plaster, moldApt 3E
2026 Jun
General repairs, mold, leaksApt 3E
2026 Jun
Paint or plaster, moldApt 3E
2026 Mar
Doors or windows, heat or hot water, paint or plasterApt 4P
Show 66 more
2026 Mar
Floors or stairs, paint or plasterApt 6R
2026 Feb
Heat or hot water
2026 Feb
MoldApt 2D
2026 Feb
ElectricalApt 6L
2026 Feb
Heat or hot water
2026 Feb
Heat or hot waterApt 6S
2026 Feb
Heat or hot water
2026 Feb
Heat or hot water
2026 Feb
Heat or hot water
2026 Feb
Heat or hot waterApt 1L
2026 Jan
Heat or hot water
2026 Jan
Heat or hot water
2026 Jan
Heat or hot waterApt 1J
2026 Jan
Heat or hot waterApt 2D
2026 Jan
Heat or hot water
2026 Jan
Heat or hot water
2026 Jan
Heat or hot water
2025 Dec
Heat or hot waterApt 1C
2025 Dec
Heat or hot water
2025 Dec
Heat or hot waterApt 1L
2025 Dec
Heat or hot water
2025 Dec
Heat or hot waterApt 1J
2025 Dec
Heat or hot water
2025 Dec
Heat or hot water
2025 Dec
Heat or hot water, pestsApt 1C
2025 Nov
Heat or hot water
2025 Nov
Heat or hot waterApt 1N
2025 Nov
Heat or hot waterApt 6S
2025 Nov
Heat or hot waterApt 1F
2025 Nov
Heat or hot waterApt 1F
2025 Nov
Paint or plaster, moldApt 6S
2025 Oct
Heat or hot water, moldApt 2D
2025 Oct
Heat or hot water
2025 Oct
Heat or hot waterApt 5D
2025 Oct
Paint or plaster, moldApt 6S
2025 Sep
Paint or plaster, pestsApt 5P
2025 Sep
Paint or plaster, pestsApt 5P
2025 Aug
Paint or plaster, pests, leaksApt 5P
2025 Aug
Paint or plaster, pests, leaksApt 5P
2025 Aug
Paint or plaster, pestsApt 5P
2025 Aug
Paint or plaster, pestsApt 5P
2025 Aug
Paint or plaster, pestsApt 5P
2025 Jul
Unsanitary conditions, pestsApt BASEME
2025 Jul
Paint or plaster, mold, pests, leaksApt 5P
2025 Jul
Unsanitary conditionsApt 5P
2025 Jul
Paint or plaster, pests, leaksApt 5P
2025 Jul
Unsanitary conditionsApt 5P
2025 Jul
Paint or plaster, pests, leaksApt 5P
2025 Mar
Paint or plaster, moldApt 2H
2025 Mar
Doors or windowsApt 6J
2025 Mar
Doors or windowsApt 6J
2025 Feb
Paint or plaster, plumbingApt 6L
2025 Feb
Heat or hot waterApt 1L
2025 Jan
MoldApt 6P
2025 Jan
Paint or plasterApt 6P
2025 Jan
Heat or hot waterApt 5J
2024 Dec
Heat or hot waterApt 5J
2024 Nov
ElectricalApt 2A
2024 Sep
LeaksApt 1E
2024 Aug
MoldApt 6N
2024 Aug
Paint or plaster, moldApt 6N
2024 May
PestsApt 2A
2024 May
PestsApt 6D
2024 Feb
Heat or hot waterApt 1N
2023 Nov
PestsApt 2A
2023 Oct
PestsApt 5P
Housing Maintenance Code Complaints and Problems, as of 2026-10-18 · See the complaints at HPD Online →
What this counts

HPD complaints received in the last 2 years; the list below is every complaint on record for the last three years

Permit history

52 permits since 1990

DOB NOW: Build – Approved Permits, as of 2026-10-17 · See every permit at DOB →
What this counts

DOB permits issued (DOB NOW and legacy BIS), one per job and work type; excludes sheds

Nothing on record

Gasno record
  • Gas pipingno recordNo open gas piping filing violations. Inspection results themselves are not published

Sources

23 datasets

Each date is when we last checked that dataset, not when the record itself was created.

Every row shows the record it came from and the date it was last checked.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.