Building health · MANHATTAN, NY
built 1895 · 7 stories · 7 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Structural permit, General construction permit
DOB NOW: Build – Approved Permits
2026 Jun
Structural permit
2026 May
Protection and mechanical methods permit
2026 Apr
1 active elevator; latest periodic inspection Apr 2026
DOB NOW Elevator Safety Compliance
2026 Mar
Latest accepted inspection Mar 2026, defects reported: no
DOB NOW: Safety Boiler
2025 Jan
Mechanical systems permit
DOB NOW: Build – Approved Permits
2024 Aug
General construction permit
2024 Jul
General construction permit
2024 Apr
Sprinklers permit
2024 Feb
Plumbing permit
2023 Oct
Antenna permit
2022 Nov
0 open. 7 violations on record in all, 2016–2022 — the 0 most recent are listed here
Housing Maintenance Code Violations
2020 Sep
Boiler burning No. 2 oil (H.B. Smith 19A-S-8), registration expired since Sep 2020
Clean Air Tracking System (boiler registrations)
2020 Aug
Safe (cycle 9, filed Aug 2020)
DOB NOW: Safety – Facades Compliance Filings
2013 Feb
No active shed permit
DOB NOW: Build – Approved Permits
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2001 Nov
Latest boiler work permit 2001 (2 on record)
DOB Permit Issuance (BIS)
1895
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.