Building health · MANHATTAN, NY
built 1907 · 6 stories · 23 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2026 Sep
Structural permit
DOB NOW: Build – Approved Permits
2026 May
Latest accepted inspection May 2026, defects reported: no
DOB NOW: Safety Boiler
2026 Apr
1 active elevator; latest periodic inspection Apr 2026
DOB NOW Elevator Safety Compliance
2025 Dec
Boiler burning No. 2 oil (H.B. Smith 28A-S/W-5), registration current since Dec 2025
Clean Air Tracking System (boiler registrations)
2025 Jun
Mechanical systems permit
DOB NOW: Build – Approved Permits
2023 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2023 Oct
VT-CAT1-CO Elevators
DOB Violations
2023 Oct
Safe (cycle 9, filed Oct 2023)
DOB NOW: Safety – Facades Compliance Filings
2023 Apr
No active shed permit; permits since Apr 2022, last expired Apr 2023
DOB NOW: Build – Approved Permits
2022 Jun
General construction permit
2022 Mar
Plumbing permit
2022 Feb
General construction permit
2021 Sep
Mechanical systems permit
2018 Jan
General construction permit
2013 Oct
Plumbing permit, General construction permit
2011 Feb
General construction permit
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
2007 Jun
Latest boiler work permit 2007
DOB Permit Issuance (BIS)
1907
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.