Building health · MANHATTAN, NY
built 1900 · 4 stories · 11 apartments
The building’s record over time
Filings, permits, complaints and violations from city records, newest first. Highlighted rows are unresolved and from the last year; older unresolved records are marked “never closed”. Tap any row to read it on the agency’s own site.
2025 Aug
Structural permit, Mechanical systems permit, General construction permit
DOB NOW: Build – Approved Permits
2025 Mar
Boiler burning natural gas (Weil Mclain EGH-85 SPN), registration current since Mar 2025
Clean Air Tracking System (boiler registrations)
2025 Mar
Electrical, general repairs, paint or plasterApt 6
Housing Maintenance Code Complaints and Problems
2025 Mar
ElectricalApt 6
2025 Mar
Heat or hot waterApt 6
2025 Mar
Doors or windows, electrical, floors or stairs, heat or hot water, paint or plaster, mold, leaksApt 6
2025 Mar
Heat or hot waterApt 6
2025 Feb
Plumbing permit
DOB NOW: Build – Approved Permits
2025 Jan
Plumbing permit
2024 Dec
General construction permit
2024 Nov
Other conditions class I · paperwork · closed
Housing Maintenance Code Violations
2024 Oct
Latest accepted inspection Oct 2024, defects reported: no
DOB NOW: Safety Boiler
2024 Apr
Pests class A · paperwork · closed
Housing Maintenance Code Violations
2023 Nov
Other conditions class I · paperwork · closed
2017 Jun
No active shed permit
DOB NOW: Build – Approved Permits
2017 Jan
Heat or hot waterApt 6 class C
Housing Maintenance Code Violations
2016 Jan
Fire protection permit
DOB NOW: Build – Approved Permits
2015 Nov
Plumbing permit, Heating/ventilation permit
2015 Sep
Walls, floors and stairs class A · never closed
Housing Maintenance Code Violations
2015 Aug
Plumbing permit
DOB NOW: Build – Approved Permits
2015 Mar
Heat or hot waterApt 6 class C · never closed
Housing Maintenance Code Violations
2014 Oct
Heat or hot water class C · never closed
2012 Jul
Latest boiler work permit 2012 (2 on record)
DOB Permit Issuance (BIS)
2007 Sep
Outside FEMA's 1% annual-chance flood zone: X
FEMA National Flood Hazard Layer
1900
Built
PLUTO (tax lot data)
Dates are the city's record dates, shown to the month.
These are city records, not an inspection by Blueflo. Every item shows its source and the date it was last checked.
Report an error · Talk to us · Look up another building
Report an error · Talk to us · Look up another building
Not an inspection and not a warranty. May not be used for tenant screening — terms of use · privacy.